Conducted
intensive gap analysis that compared the "as-delivered"
functionality of
MAXIMO 5.2®
(transportation) to the requirements of FedEx's Feeder
Aircraft Operations. Activities included: (1)
providing advice and guidance in closing identified gaps,
(2) Educating technical staff in Maximo functionality and
java objects, (3)
developing technical specifications, and (4) delivering
turnkey code solutions.
Also developed custom training documentation for all Maximo
applications and performed on-site, end-user training for FedEx maintenance
personnel

Deployed and implemented
MAXIMO 5.2® for the Department of Forestry
and Fire Protection's Aviation Management Unit. Replacing a legacy aircraft maintenance system, Maximo is now used
to manage the maintenance program of all of the unit's fire fighting and fire support aircraft. MMSI performed all
aspects of this complex implementation including a needs assessment study and gap analysis, implementation planning,
conversion of legacy data, system design and configuration, customization of over 50 JSP pages, development of over 20
Actuate reports, design and implementation of all standard operating procedures, end-user and system administrator
training, and testing.

Provided comprehensive, on-site training program for this
public utility in
MAXIMO 6®
System Administration. Topics included Database
Configuration, Application Designer, Maximo installation and
Setup, Organization setup, and much more.

Provided comprehensive, on-site training program for this
manufacturer of wind turbines in
Writing Reports with Actuate for MAXIMO 5.2®.

Provided
MAXIMO 5.2®
workflow training to staff members responsible for
administering Maximo at this organization's various
locations.

Conducted comprehensive
MP2 training program for this global specialty pharmaceutical and medication delivery company

Deployed and implemented
MAXIMO® for this Public Bus Transportation
System that serves 7 collar counties in suburban Chicago. The system
includes 11 garage facilities, a headquarters building, and 3 transportation
centers. Performed all aspects of implementation including a site assessment study,
implementation planning, data collection, data preparation, data entry, system
design and configuration, custom reporting, training, and testing.
More recently selected to provide MAXIMO
4®
to MAXIMO 6®
upgrade services.

Assisted this Public Wastewater Authority located in
Suburban Chicago with its selection of a new CMMS.
Activities included defining maintenance management system
requirements, preparation of a formal RFP, evaluation of vendor
proposals and products, and
final selection of a CMMS/EAM provider.

Assisted
this Chicago-based food products company with its efforts to implement and deploy
MAXIMO 4.1.1®.
Activities included screen and database customization, data
conversion, SOP
design, and custom report development.

Implemented
MAXIMO® for this
global nuclear company's advanced waste materials treatment
plant in Idaho. Activities
included site assessment, implementation planning, system
design, setup, and configuration, training, and testing.

Provided comprehensive, on-site training program for this
world leading business development and logistical support
consulting firm in
Writing Reports with Actuate for MAXIMO 5.2®.

Implemented
MAXIMO® for this D/FD-operated steam
turbine generator Facility in Indiana. Performed all aspects of implementation
including a site assessment study, implementation planning, SOP development
system design and configuration, legacy data conversion,
training, and testing.

Assisted this large, diversified producer of steel tubular
products in its MAXIMO®
4.0 to MAXIMO 4.1.1 upgrade efforts. Activities included
upgrading all client workstations and server.

Assisted this Airport with its MP2
Enterprise® deployment efforts. Activities included system
setup, customization, reporting, and system administrator
training.

Provided
customized MP2® training
and consulting advice to this manufacturer of powertrain
technology.

Deployed and implemented
MAXIMO® for this Public Wastewater Authority
in suburban Chicago. Performed
all aspects of implementation including a site assessment
study, implementation planning, data
collection, data preparation, data conversion and entry, system design
and configuration, custom reporting,
training, and testing.

Deployed and implemented MAXIMO® for this
midwest telecommunications firm covering a five state region, five thousand facilities, and
five hundred mobile maintenance employees. Activities
included design and installation of local and wide area network
infrastructures, contract negotiations with software vendor,
specifying all integration, reporting, and customization
requirements, and project management.

Provided
comprehensive MP2®
training and consulting services to this well known food and
agricultural products company.

Implemented MP2® for this
public wastewater processor in suburban Philadelphia. Activities
included system setup, data conversion, procedures
development, and conducting a comprehensive, custom training
program for all maintenance employees.

Developed
standard operating procedures (SOPs) for the use of MP2®
and conducted
comprehensive, custom MP2® training
program for this power company's contract generation plant
in Springfield, New Hampshire. SOPs were developed for
procurement, inventory, and work management processes.

Conducted comprehensive, custom
MAXIMO 5.2®
training program for this international, full-service, trade seaport in Northeast Flordia. Training program included
Work Management, Procurement, Inventory, and Work Flow design topics.

Conducted comprehensive, custom
MAXIMO training program
for this 1,168 MW project in southwest Illinois. Training program included
Work Management, Procurement, and Inventory topics.

Assisted
this diverse, global
leader in mechanical and electrical construction, energy
infrastructure, and facilities services with its
implementation of
MAXIMO 52®.

Provided
Maximo consulting
services to this humanitarian organization's facilities in
Maryland.
|
 |

Assisted
this maker of whole food supplements with its
implementation of MAXIMO® 6.
Activities included design and implementation of legacy data
conversion scripts, consulting advice in the installation
and use of Maximo, and end-user and system administration
training.

Performed multiple projects for this food products company
including the
implementation of MAXIMO® 4.1.1
at its 14 plants across the US, assistance in upgrading to
MAXIMO 5.1®
and to
MAXIMO 5.2®,
training, data conversion, and more.

Developed a comprehensive, custom MAXIMO®
training program for this manufacturer or specialty metals.

Assisted this leading provider of energy services in its
efforts to upgrade to MAXIMO
6®
from MAXIMO 4®.
Activities included migration of data, application
configuration and customization, Actuate report development,
and deployment of Maximo's Mobile Inventory Manager.

Provided
comprehensive, on-site training for this world class
supplier of ductile iron pipe and fittings in MAXIMO
6®.
Topics included procurement and inventory management.

Assisted
this leader in the development and commercialization of
catalytic distillation based processes maintenance operation by providing
support in its efforts to use MAXIMO
5.2®
in an effective manner. Activities included custom training and assistance
in the development of standard operating procedures.

Conducted
comprehensive, custom MAXIMO 4®
training program for
this city's wastewater maintenance operation.

Assisted
the maintenance operation of this food products company by providing
support for its use of MP2 Enterprise®.
Support included custom training and assistance with
day-to-day operations.

Assisted
this organization's maintenance operation by providing
support for its use of MP2 Enterprise®.
Support included custom training and assistance with
day-to-day operations.

Assisted
this organization's maintenance operation by providing
support for its use of MP2 Enterprise®.
Support included custom training and assistance with
day-to-day operations.

Designed, implemented, and conducted an
MP2®
training program for this national real
estate services firm. Also conducted a CMMS
improvement project for same organization.

Implemented MP2 Enterprise® for the nation's 4th largest container seaport. Designed
standard maintenance operating procedures and performed all aspects of
implementation including system design, conversion,
customization, training, and testing. Using third party
database and reporting software, also created a library of
custom reports and system interfaces

Assisted
this Port Authority with its efforts to
select new EAM software by defining maintenance management
system requirements for its commercial, maritime, and public
use facilities along 7.5 miles of waterfront. Prepared a formal RFP
for a new computerized maintenance
management system (CMMS), evaluated CMMS/EAM vendor proposals and products,
and selected a CMMS/EAM provider.

Assisted this Public
Bus Transportation System in California's Contra Costa
County with its selection of a new CMMS.
Activities included defining maintenance management system
requirements, preparation of a formal RFP, evaluation of vendor
proposals and products, and
final selection of a CMMS/EAM provider.

Provided
customized MP2® training
and consulting advice to this leading manufacturer of
wallcovering products.

Implemented
MAXIMO® for the Chicago area campuses of this University.
Performed all aspects of implementation including a site assessment study, implementation planning,
system design and configuration, custom development of a web-entry
service request screen, legacy data conversion,
training, and testing.
Implemented
MP2 Enterprise® for this
Midwestern financial
services institution with major offices in 3 states and 6 cities. Performed all
aspects of implementation including system selection, design,
conversion, training, customization, and testing. Using third
party database and reporting software, also created a library
of custom reports and system interfaces.

Conducted comprehensive
MP2 Enterprise® training program for this
manufacturer of sandwich and specialty meats. Also assisted in deployment of MP2's barcoding module, conversion
of spare part item numbers, and custom report development.

Conducted comprehensive
MP2® training program for
this company's Wheel and Forged Products division in
Lebanon, Virginia.

Conducted comprehensive
MAXIMO®
training program for Boeing's Integrated Defense Systems
operation at the Kennedy Space Center.

Conducted
an
MP2®
training and evaluation program for this specialty coil
coating corporation that serves the appliance, automotive,
construction, container, and door industries.

Conducted
an
MP2®
training and evaluation program for this food products
company.

Conducted
a customized
MP2®
training and evaluation program for this manufacturer of
residential and commercial flooring products

Conducted
a customized
MP2®
training and evaluation program for this developer and manufacturer of
pancreatic enzymes, heparin, and its analogs. Also assisted
in the development of standard operating procedures for the
organization's use of MP2.

Conducted
a customized
MP2®
training and evaluation program for this organization's
power plant in Covert, Michigan. Also assisted
in the development of standard operating procedures for the
organization's use of MP2.

Conducted
a customized
MP2®
training and evaluation program for this tier 1 automotive
supplier that specializes in the manufacturer of
transmission related parts. Also assisted
in the development of standard operating procedures for the
organization's use of MP2.
|